Fuel stations, highways, large shopping malls.
The workhorse of the Pulse EV network — these are the stations deployed in Tashkent and on intercity routes. 20–30 minutes and the car is ready to go on.
Number of ports, enclosure type and configuration are defined when tailoring the setup to the site. Applications are indicative — the exact model is chosen after a site survey.
Installation and cabling are quoted separately after the site survey.
Residential complexes, offices, private homes.
Small parking lots, cafés, car services.
Shopping malls, business centers, fuel stations.
Transport hubs, taxi fleets, highways.
Highway hubs, commercial fleets.
Engineer visit, available power measurement, choice of installation point and cable route.
Model, power, number of ports and connection scheme — matched to your grid parameters.
One contract for the whole cycle. Delivery — 14 days from signing.
Foundation or mounting, cabling, installation and grid connection.
Test charges, billing launch, listing the location in the Pulse Drive app and on online maps.
Operating briefing, documentation, commissioning certificate.