Six models from 7 to 480 kW. GB/T connector on every model — compatible with BYD, Zeekr, Li Auto and other Chinese brands without adapters.

Residential complexes, offices, private homes.

Small parking lots, cafés, car services.

Fuel stations, highways, large shopping malls.

Highways, busy fuel stations, transport hubs.

Transport hubs, taxi fleets, highways.

Highway hubs, commercial fleets.
Number of ports, enclosure type and configuration are defined when tailoring the setup to the site. Applications are indicative — the exact model is chosen after a site survey. All prices include 12% VAT.
Stations are rated for Uzbekistan's grid parameters and climate: voltage fluctuations, summer heat and sub-zero winters are accounted for when selecting the configuration.
Most EVs in Uzbekistan are Chinese brands: BYD, Zeekr, Li Auto and others. All our stations ship with GB/T connectors compatible with this fleet without adapters.
Site survey, power selection, delivery, installation, commissioning, staff training and service — from one supplier, under one contract.
More than 30 stations installed. We know where grid connection problems actually arise and how to prevent them at the design stage.
Installation and cabling are quoted separately after the site survey. incl. 12% VAT, base configuration with GB/T connector.
How AC charging differs from DC: power, charging time, price and where each fits. AC 7 kW from 2,400,000 UZS for home, DC 20–480 kW for business.
Learn more →How much a home EV charging station costs in Uzbekistan: AC 7 kW — 2,400,000 UZS incl. VAT, GB/T connector, 12-month warranty, delivery in 14 days. What installation requires.
Learn more →How and where to charge Chinese EVs in Uzbekistan: BYD, Zeekr, Li Auto, Chery and Hongqi use the GB/T connector. The Pulse EV network has 30+ stations in Tashkent, Kokand, Navoi, Karshi and Andijan.
Learn more →How to earn from an EV charging station in Uzbekistan: invest from 33,000,000 UZS and keep 80% of gross profit, or host a station with no investment for 15% of revenue.
Learn more →Engineer visit, available power measurement, choice of installation point and cable route.
Model, power, number of ports and connection scheme — matched to your grid parameters.
One contract for the whole cycle. Delivery — 14 days from signing.
Foundation or mounting, cabling, installation and grid connection.
Test charges, billing launch, listing the location in the Pulse Drive app and on online maps.
Operating briefing, documentation, commissioning certificate.
One engineer visit — and you get a tailored configuration, connection scheme and an exact quote for your site.