A charging station earns on every session. The question is who invests in the equipment and how revenue is split.
With Pulse EV there are two ways to earn from a charging station. Investment: buy a DC station from 36,400,000 UZS (20 kW) and keep 80% of gross profit — revenue minus the cost of electricity. Site hosting: provide the space and electricity with no investment and receive 15% of revenue after the electricity bill.
Drivers pay for charging in the Pulse Drive app. The cost of electricity used is subtracted from the station's revenue — that is gross profit. In the investment format 80% of gross profit is yours; Pulse EV keeps 20% for the platform, service and support.
We choose the location together: an engineer measures grid capacity and assesses traffic and access.

Small parking lots, cafés, car services.

Shopping malls, business centers, fuel stations.

Fuel stations, highways, large shopping malls.
All prices include 12% VAT.
The investment program starts with DC 20 kW — 36,400,000 UZS incl. VAT. DC 60 kW — 84,448,000 UZS, DC 120 kW — 116,480,000 UZS. With site hosting the investment is 0 UZS.
It depends on the location, power and utilization of the station, so there is no universal figure. We calculate it for a specific site after the survey.
No. AC 7 kW is for personal use only; the 80/20 program starts with DC 20 kW.
One engineer visit — and you get a tailored configuration, connection scheme and an exact quote for your site.