Shopping malls, business centers, fuel stations.
The optimal station for urban sites with customer traffic: 40–60 minutes gives most EVs a full day of range. Two GB/T ports in the base configuration.
Number of ports, enclosure type and configuration are defined when tailoring the setup to the site. Applications are indicative — the exact model is chosen after a site survey.
Installation and cabling are quoted separately after the site survey.
Residential complexes, offices, private homes.
Small parking lots, cafés, car services.
Fuel stations, highways, large shopping malls.
Transport hubs, taxi fleets, highways.
Highway hubs, commercial fleets.
Engineer visit, available power measurement, choice of installation point and cable route.
Model, power, number of ports and connection scheme — matched to your grid parameters.
One contract for the whole cycle. Delivery — 14 days from signing.
Foundation or mounting, cabling, installation and grid connection.
Test charges, billing launch, listing the location in the Pulse Drive app and on online maps.
Operating briefing, documentation, commissioning certificate.